• Hours: Mon-Thur 6 AM to 8 PM  | Fri 6 AM -8PM | Sat-Sun 8 AM to 8 PM

    Ranch House Phone  970.963.6300

    Email: frontdesk@rvrcommunity.com

     

     

Design Review

Welcome to Design Review section of the Library. This area includes the most current version of the River Valley Ranch Design Guidelines, forms to request a review with the DRC, and checklists of required materials for Preliminary and Final Design submittals.

Please see the below DRC Schedule for meeting times and days.

If you have any questions about the Design Review process, feel free to contact Community Services Manager Kendra Ford at 970.963.6300.

Please remember: All exterior landscape or structural improvements at RVR are required to be reviewed.

DRC Meeting Schedule

2021 DRC Meeting Schedule

 

RVRMA Design Guidelines

The Design Guidelines outline the design standards for River Valley Ranch as well as construction requirements and guidelines.

RVRMA Design Guidelines, 8th Edition, 2017

RVRMA Design Guidelines, 8th Edition, 2017 & Amendments Searchable Document (use Ctrl F for search feature)

RVRMA Design Guidelines, Appendix, 8th Edition, 2017

First Amendment to the RVRMA Design Guidelines – Improvements, Structures, Sculptures

Second Amendment to the RVRMA Design Guidelines – Neighborhoods: Special Requirements

Third Amendment to the RVRMA Design Guidelines – Political Signs

Fourth Amendment to the RVRMA Design Guidelines – Deer/ Wildlife Fencing

Fifth Amendment to the RVRMA Design Guidelines – DRC Meetings, Fees and Inspections

Sixth Amendment to the RVRMA Design Guidelines – Common Assessment: Block B

Seventh Amendment to the RVRMA Design Guidelines – Irrigation Controls

Eighth Amendment to the RVRMA Design Guidelines – Construction and Builder Regulations

Ninth Amendment to the RVRMA Design Guidelines – Fences, Privacy Screens, Retaining Walls

Tenth Amendment to the RVRMA Design Guidelines – Exterior Stairs

Eleventh Amendment to the RVRMA Design Guidelines – Professionals

Twelfth Amendment to the RVRMA Design Guidelines – Meeting Agenda

Thirteenth Amendment to the RVRMA Design Guidelines – Exterior Trim

Fourteenth Amendment to the RVRMA Design Guidelines – Minimum Planting Requirements

Fifteenth Amendment to the RVRMA Design Guidelines – Fire Pits/ Exterior Fireplaces

 

DRC Forms and Checklists

Design Review – Administrative Reviews

Administrative Design Review Process

Home Improvement Application

Design Review – DRC Committee Reviews

Building at River Valley Ranch

Pre-Design Conference – Purpose and Process

Design Review Request and Contact Form

Common Submittal Design Issues

Important Design and Construction Deadlines

Design Review Fee – What Does It Pay For?

Preliminary Design Submittal – Checklist

Final Design Submittal Checklist

Final Design Submittal Requirements

Materials Spec Sheet

Design Review – Construction Management

Pre-Construction Meeting Checklist

Final Construction Sign-Off Checklist

Construction Deposits, Fees, and Fines (Appendix K)

Builder Violations

Important Design and Construction Deadlines

Irrigation Specs

Construction Signage

Building at River Valley Ranch

Pre-Design Conference – Purpose and Proces

Design Review Request and Contact Form

Common Submittal Design Issues

Important Design and Construction Deadlines

Design Review Fee – What Does It Pay For?

Preliminary Design Submittal – Checklist

Final Design Submittal Checklist

Final Design Submittal Requirements

Materials Spec Sheet

 

DRC Committee Members
Kevin Kreuz, Architect, DRC Chair

Kelleigh Condon, Architect

Jennifer Dicuollo, Landscape Architect